Guide

Quoting accurately: from site survey to bill of materials

Most quoting mistakes are made on site, long before the proposal is written. Here's how to catch them.

An inaccurate quote costs you twice: once in the margin you lose, and again in the awkward conversation when you ask the client for more. Accuracy starts at the site survey.

Capture more than you think you need on site

A good survey records the things that are hard to see later:

  • Room by room requirements. What the client wants in each space, in their words.
  • Construction and access. Wall types, ceiling voids, floor build-up and routes for cables.
  • Existing services. Consumer unit, incoming internet, existing wiring, heating controls and anything you'll connect to.
  • Network locations. Where the rack will go, and where access points need to be for good coverage.
  • Photos and measurements, labelled by room, so anyone in the team can quote from them.

If you can't answer a question on site, note it as an assumption. Assumptions go into the proposal so the client can confirm them.

Turn the survey into a scope

Before you price anything, write down the systems in scope and what each one includes. This is the list the client will agree to, and the list you'll check your hardware against.

Keep it plain: "Lighting control in ground floor living spaces and kitchen" is clearer than a list of part numbers.

Build the bill of materials from the scope

For each system in scope, list every item you'll need, including the unglamorous ones:

  • Network switches, patch panels, power distribution and the rack itself
  • Cable, connectors, back boxes and containment
  • Power supplies, mounting kit and consumables

Then plan the cable schedule. Knowing every run before first fix catches missing cable, wrong cable types and impossible routes while they're still cheap to fix.

Check scope against hardware

The single most useful check is simple: for every system in scope, is there hardware on the proposal to deliver it? A system in scope with nothing priced against it is a guaranteed loss.

Also check the reverse. Hardware with no system in scope is often a leftover from an earlier version.

Version your proposals

Scope changes after the survey are normal. Clients add rooms, drop features and change their minds. Save each change as a new version rather than overwriting the last one, so you can show exactly what changed and why the price moved.

How Luxeia Flow helps

Luxeia Flow structures every proposal around the way installers scope a job: systems and design, build, network rack, cable schedule and bill of materials. It warns you when a system is in scope with no matching hardware, and keeps every version. See proposals in Flow.

Run your whole installation business from one place

Start a 30-day free trial. No card needed. Or book a demo and we will walk you through it.