Guide
How to price a smart home proposal (without giving away your margin)
A good price wins the job and still pays you properly when the install runs long. Here's a structure that does both.
Most installers don't lose money on the jobs they turn down. They lose it on the jobs they win at the wrong price. This guide sets out a simple, repeatable way to build a smart home or AV proposal so the price reflects the real cost of the work.
Start from cost, not from the price you think they'll pay
It's tempting to start with a number that feels right for the client, then make the line items fit. Do it the other way round. Build the cost first, then add margin, then decide how to present it.
Break every proposal into four cost groups:
- Materials and hardware. Everything you buy in, at what it actually costs you, including delivery.
- Design. The time spent turning a brief into a system: drawings, schedules, programming plans.
- Labour. First fix, second fix, commissioning and programming, handover and snagging.
- Travel and extras. Mileage, parking, accommodation, consumables and anything else that leaves your pocket.
If you only track materials and labour, design and travel quietly come out of your margin on every job.
Cost your labour honestly
Labour is where most smart home proposals go wrong. Two things help.
Use an internal cost rate, not a sell rate. Work out what an hour of each person actually costs the business, including wages, employer costs, vans, tools, software and the hours that can't be billed. That internal rate is the floor. Your sell rate sits on top.
Price the stages, not just the install days. Commissioning and programming routinely take longer than planned, and handover takes time to do properly. Put a line for each so they're visible and priced.
Decide your margin before you start discounting
Set a target margin for the business, then check every proposal against it before it goes out. Look at margin on the whole job and on each cost group. A job can look healthy overall while labour is being given away and hardware is carrying the whole thing.
If the only way to win a job is to drop below your target margin, it's worth asking whether you want that job at all.
Charge for design
Design is skilled work, and clients who value it will pay for it. Price it as its own line, linked to the systems in scope. It sets expectations that the design is part of the service, and it covers the cost if the client takes your plan and doesn't proceed.
Present the price clearly
How you present the price matters as much as the number.
- Group by system, such as lighting, heating, AV, security and networking, so the client sees what they're paying for.
- Show options for clients who want to phase the work, rather than cutting your price to fit a budget.
- Include aftercare as a recurring line in the same proposal, so support is part of the decision. See our guide on recurring revenue from aftercare.
- Set a validity period that matches how long your suppliers hold their prices.
Check before you send
Before any proposal goes out, run through a short checklist:
- Is every system in scope backed by hardware on the proposal?
- Have you included network equipment, racks and cabling, not just the visible devices?
- Is labour priced for every stage, including commissioning and handover?
- Does the payment schedule cover your hardware outlay? See deposits and stage payments.
- Is the margin at or above your target?
How Luxeia Flow helps
Luxeia Flow shows value, cost and margin on every proposal as you build it, split into materials, design and labour, and travel and extras. Your internal cost rates sit behind the numbers, and Flow warns you when a system is in scope with no hardware against it. See how proposals work.
Run your whole installation business from one place
Start a 30-day free trial. No card needed. Or book a demo and we will walk you through it.
